
Lyra
from
AED 1.2M
Sign in to iMatch to contact agents directly and get matched with this project.
Sign inProject details
- Floors
- 20
- Service charge
- AED 18-20/sqft (estimated)
- Handover
- 2030-05-15
- Construction
- 0% complete
About this project
Lyra at Ghaf Woods is a residential tower by Majid Al Futtaim in Ghaf Woods, Dubailand, with 348 one- and two-bedroom apartments (199 one-bedroom and 149 two-bedroom) over 20 floors, set among landscaped areas and natural woodland. It is a 300 m walk from Ghaf Woods Mall and 700 m from the community's upcoming school. The developer's brochure shows five layouts with average sizes of 638 sq ft for the 1-bedroom, 622 sq ft for the 1-bedroom+ with a powder room, 859 sq ft for the 1-bedroom garden unit, 967 sq ft for the 2-bedroom and 1,325 sq ft for the 2-bedroom garden unit. Interiors use the Prelude palette of warm earthy tones, natural oak and terracotta accents. Launch prices quoted by brokers start from AED 1.2M for 1-bedroom and AED 1.9M for 2-bedroom apartments; official prices are still to be announced. The payment plan is 50/50: 10% on purchase, seven instalments totalling 40% from 15 March 2027 to 15 July 2029, and 50% on completion on 15 May 2030. The estimated service charge is AED 18 to 20 per sq ft. Sales started on 26 October 2026, and expressions of interest opened on 4 November 2026 with an EOI of AED 50,000 per unit. Construction is scheduled to start on 15 August 2027. Residents get a pool lounge and terrace, an indoor/outdoor gym, a social suite and resident lounge, bookable dining, an outdoor entertainment terrace, a multipurpose lawn, a tranquillity walk, a workspace and podcast studio, a sky lounge and sky garden on the 19th floor, a multipurpose sports court and a wellness garden, with Ghaf Woods' central forest, jogging track and mountain bike trail close by.
Payment plan
50/50
100% total1st instalment - On purchase
2nd instalment - 15 March 2027
3rd instalment - 15 July 2027
4th instalment - 15 December 2027
5th instalment - 15 May 2028
6th instalment - 15 October 2028
7th instalment - 15 March 2029
8th instalment - 15 July 2029
On completion - 15 May 2030
Amenities
- Wellness & fitness
- Indoor/outdoor gymWellness gardenWorkspace & podcast studio
- Pools & water
- Pool lounge and terrace
- Leisure & outdoors
- Jogging trackMultipurpose sports courtOutdoor entertainment terraceSky gardenSky loungeSocial suite / resident lounge
- Services & security
- Bookable dining
- Other
- Central forestMountain bike trailMultipurpose lawnTranquillity walk
Project documents
Sign in to iMatch to access brochures, payment plans and floor plans for this project.
Sign in